The Brief
The Challenge
Shiny Floors was engaged to remove and replace 120m² of water-damaged engineered timber flooring at Garden State Hotel, one of Melbourne's busiest hospitality venues.
Process
Four days, start to finish
01
Floor removal
Carefully uplifted and removed 120m² of water-damaged engineered timber.

02
Surface preparation
Mechanically ground the concrete substrate to remove adhesive residue and contaminants.

03
Concrete levelling
Prepared and levelled the slab for a smooth, even base.

04
Installation
Supplied and installed new engineered timber flooring built for long-term durability.


Scope of Works
- Flooring removal
- Concrete grinding & preparation
- 19mm engineered timber flooring
- Full-trowel installation
- Detailed finishing & caulking
Completed within a tight four-day turnaround, minimising disruption to hotel operations while delivering a professional, durable finish built for heavy commercial traffic.